EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
E-Xenos
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (122)
Research
Workshop
- (4)
-
Preparations at BACE...
-
Preparation - shelf...
-
Setting up workspace...
Empennage
- (1)
-
Y tail riveting
Fuselage
- (78)
-
Checking the fit
-
Checking the fit
-
Rivets in cockpit...
-
Drilling into STICK...
-
adjust rudder...
-
Charger installation
-
Sit test
-
Seat sling installation
-
various
-
Puyallup fair
-
drilling through...
-
First Rollout
-
Installed axles and...
-
Motor mount and...
-
Motor mount trial fit
-
re-drill for wheel...
-
Fabricated and...
-
Grinding motor mount...
-
Skin polishing and N...
-
Attach fwd fuselage
-
seat assembly
-
cockpit work and...
-
Cockpit floor...
-
Fuselage work
-
Cockpit to Fuselage
-
visit by Nantu...
-
Deburring and more
-
Checking the fwd...
-
Firewall and...
-
Kitsap Sun front page
-
Y-tail and more...
-
Firewall
-
Forward fuselage...
-
Turtle back Rib...
-
Firewall fabrication
-
General fuselage
-
Riveting the...
-
Wing leading edge...
-
Turtle deck,...
-
Ribs for turtle deck...
-
Cockpit side panels
-
Yasmine pulls rivets
-
Fuselage box assembly
-
Phenolic work starts
-
Fuselage box assembly
-
More Corrosion...
-
Corrosion protection
-
Y-tail frame to...
-
Turtleneck work...
-
Squaring of...
-
More squaring of...
-
Squaring fuselage
-
Fuselage box - start...
-
Begin assembling...
-
nut plates for two...
-
U-channel work and...
-
Fuselage cross-ties
-
Fuselage cross-ties...
-
Tips of V tails
-
Nut plates in...
-
V-tail
-
Y-tail skeleton
-
Data probe
-
Ribs continued
-
V-Tail ribs continued
-
V-tail ribs correction
-
tail hinge
-
bending tail ribs
-
Fixing bad V-tail...
-
shop cleanup and...
-
Shop cleanup and...
Firewall
Tail Feathers
- (7)
-
Y tail assembly
-
Y tail install
-
Y tail install
-
MJ and Mark fitting...
-
Fitting the tail
-
Stabilator assembly
-
Stabilator fabricaton
Wings
- (27)
-
Bottom wing skin...
-
Bottom wing skin...
-
Leading Edge Assembly
-
Right wing fully...
-
Skins on right wing...
-
Spar riveting...
-
Slight spar swerve...
-
6 layer spar
-
spar rivets continue
-
spar chemical...
-
Dimpling and...
-
belly skin and...
-
FLY ELECTRIC LLC...
-
Wing spar and wing...
-
wing spar riveting
-
Lysa Wyni visits...
-
All 4 Jesus nuts are...
-
Crowded shop
-
Wing work starting -...
-
Ribs Ribs Ribs
-
Aft Spar layout
-
seatbelts and more
-
Leonard B drilling...
-
Wing spar to...
-
Wing spar to fuselage
-
rudder pedals -...
-
Install bracket to...
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
- (2)
-
Assembly of...
-
Powerplant removal...
Propeller
Fuel System
Interior Finish
- (1)
-
Oregon Aero Interior
Paint / Decals
Inspection
Tools
Kit Arrival
- (2)
-
MJ arrives with...
-
MJ Arrives with the...
Builder Name:
zachary krause
-
Project:
Xenos
-
VIEW REPORTS
Total Hours:
805.5
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Sep 12, 2021 - Sep 10, 2023
Engine:
Flit electric
Propeller:
Sensenich fixed pitch wood propeller
Panel:
Uavionics
Friendly URL:
https://eaabuilderslog.org?s=E-Xenos
Home or Last Project Picture
Aug 14, 2021
Preparation - shelf cleanout
- (16 hours)
Category: Workshop
Lots of marvelous "things" have been donated or simply dumped at BACE, resulting in low availability of horizontal space on shelves and benches. This is the continuation of the cleanout and revamp...
2021-1030 eXenos non-aero shelf cleanout 1.jpeg
2021-1030 eXenos non-aero shelf cleanout 2.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.